RE: Datacenter electrical/genset

I think maybe the reason you are being flamed is because generally people put in charge with the design/roll out of a data center environment should already know something about the logistics of such a project. Whether it is power, network, or pretty much any aspect of it for that matter. Also it can be fairly hard to determine the power requirements of a location without specific information, and the lack of said information probably frustrated people.

Just a little editorial on why you may be getting flamed.

-Drew