Possible topic?

Steven (and all),

First I feel I should apologize to you and Sprint. I have spoken
with our MCI guy and found out that they are waiting on the install
of 2 DS3's on Oct. 30th. One being installed in to Sprint NAP 3
and one in to Sprint NAP 4. I am not sure why he mentioned that
there was a problem with the NAP itself. It might have been
easier than explaining to us that they needed additional
bandwidth. :slight_smile: At any rate, I jumped the gun in the assumption
of the story I was being fed.

The two tickets we have open with MCI are:

794 (Sept 13)
1320 (Oct 6)

They are supposed to be appended to other tickets as well.

Sean Rolinson
snowdog@charm.net